The power drum transmission line should not only be used, but also the daily maintenance of the power drum transmission line should not be neglected.
1. When the power drum transmission line is installed and disassembled, we must pay attention to the parallelism between the centerline of the equipment and the centerline of the gear for the first time. This point is very important and can not be ignored. It is also necessary to find a suitable point of view and aim at the point of view. Only in this way can we do a good job in the basic operation of the device.
2. After the power drum conveyor line is installed, it is necessary to check whether there are screws to forget the device, or if there is a loosening phenomenon, which often occur, so after the installation, we must pay attention to check these problems.
Otherwise, do not turn on the machine, try the machine, the power drum transmission line is very good installation, only need the device instructions to come.
3. The power drum transmission line should check whether the parts are worn. If there is something wrong, stop the operation immediately, check the cause of the fault of the machine, and then work after it is repaired.
Also check to see if there is any damage to the wires and cables, otherwise it will be very risky once the leakage is found.
+86 139 2598 9288
+86 757 22273366
Contact: Mandy
Mobile phone :+86 139 0283 8059
Seat machine :+86 757 22273366
E-Mail:dhy@chaomaida.com
Ground address:No. 3, Industrial Road, Fu Yu Village, Le Liu Zhen, Shunde District, Foshan City, Guangdong Province
Follow Chaomaida